ARTICLE AD BOX
The Federal Government has announced a partial closure of sections of the Ikorodu–Sagamu Road beginning Monday to let ongoing rehabilitation works connected damaged portions of the highway.
The Federal Controller of Works successful Ogun State, Olayiwola Komolafe, disclosed that the impermanent closure became indispensable to alteration contractors proceed reconstruction enactment connected captious sections of the road.
According to him, the Minister of Works, David Umahi, directed Arab Contractors to instrumentality to the tract and accelerate completion of cardinal aspects of the project.
Komolafe stated that the affected sections see the agelong from Ikorodu Roundabout to Sabo Junction, arsenic good arsenic the Lagos Cement to Coca-Cola axis inward Sagamu.
He explained that motorists travelling from Ikorodu toward Sagamu would beryllium redirected done alternate lanes nether a counterflow postulation statement during the repair period.
According to the controller, the reconstruction workout is expected to past for 3 months to let for operation activities and capable curing of the factual pavement.
He added that officials of the Lagos State Traffic Management Authority, LASTMA, would beryllium deployed to negociate vehicular question and easiness postulation on the corridor.
Motorists were urged to cooperate with postulation mana...





![‘My gov is aware’ – Stunted man, Buba concludes APC screening for House of Reps [VIDEO]](https://dailypost.ng/wp-content/uploads/2026/05/Buba-.jpg)




















English (US) ·